RB

R. Binnekamp

34 records found

Improvement in rail asset safety, comfortability and serviceability is gaining importance. This requires effective service life management by incorporating multi-stakeholder desires in the early design stage. Typical stakeholders are asset owners, train users and maintenance serv ...
Floating wind farms are a promising solution for offshore wind energy production in deep waters. However, the design optimisation process of these farms is difficult due to their complex and multidisciplinary nature. Furthermore, current optimisation methods: 1) ignore and/or pro ...

Best Fit for Common Purpose

A Multi-Stakeholder Design Optimization Methodology for Construction Management

Within traditional design processes, decisions are often made based on individualistic values and late-stage assessments conducted on a predefined set of design alternatives potentially leading to suboptimal design decisions and conflicts. The issues are further amplified by the ...
Building Information Models (BIM) should reflect all aspects and phases of the construction projects life cycle. However, in current contractor practices, a proliferation of different information systems has arisen, each of which in turn illuminates a different information model ...
Construction project management requires dynamic mitigation control to ensure a project's timely completion. Current mitigation approaches are usually performed by an iterative Monte Carlo (MC) analysis which does not reflect (1) the project manager's goal-oriented behavior, (2) ...

MitC

Open-source software for construction project control and delay mitigation

Changes in a construction project schedule can impact the project's planned duration, resulting in penalties. A manual trial-and-error probabilistic approach is usually conducted to find an appropriate set of corrective measures to mitigate delays of the overall project. However, ...
The wellbeing of modern societies is dependent upon the functioning of their infrastructure networks. This paper introduces the 3C concept, an integrative multi-system and multi-stakeholder optimization approach for managing infrastructure interventions (e.g., maintenance, renova ...

Mitigation Controller

Adaptive Simulation Approach for Planning Control Measures in Large Construction Projects

Probabilistic Monte Carlo simulations are often used to determine a project's completion time given a required probability level. During project execution, schedule changes negatively affect the probability of meeting the project's completion time. A manual trial and error approa ...
Despite widespread attention for the governance of infrastructures and improvements of the way infrastructure assets are maintained, the interdependency of infrastructures is not often considered from a systemic maintenance and renovation perspective. In this context, the issue o ...

The open design education approach

An integrative teaching and learning concept for management and engineering

Construction Management and Engineering students need to acquire managing skills for solving real-world problems that are complex, rarely straightforward and lack 'one right answer'. For this, they need to become 'open designers', capable to be reflective, integrative and creativ ...
With the rapid development of real estate markets under globalization and exponential competitive market conditions, risk evaluation has been one of the most important tasks in the process of real estate investment valuation. This paper describes the relationship between construc ...
Purpose: One of the long-standing issues in the field of corporate real estate management is the alignment of an organisation’s real estate to its corporate strategy. To date, 14 models for corporate real estate (CRE) alignment have been made, as well as four comparative studies ...
In Europe, the DIRECTIVE 2010/31/EU requires increasing the number of nearly zero energy buildings. The existing building stock needs to be included in order to achieve the 2020 EU environmental targets. The main barriers of energy neutral refurbishment of existing non-residentia ...
Purpose–Alignment of corporate real estate to a corporation’s business strategy is a long-standing issue. In the past multiple models have been developed to support this process, but research shows that they fall short on certain parts of the CRE alignment activity, often lack tr ...

Improving CRE decision making at Oracle

Implementing the PAS procedure with a brute force approach

Purpose –Alignment of corporate real estate to a corporation’s business strategy is a long-standing issue. In the past multiple models have been developed to support this process, but research shows that they fall short on certain parts of the CRE alignment activity, often lack t ...
The department of MBE was originally called Real Estate & Project Management (BMVB: ‘Bouwmanagement & Vastgoedbeheer’) covering the domains of construction management and real estate management. The “raison d’être” for this new department was based on the recognition that a fair ...
Net zero energy is already an ambitious target for several buildings, especially since the DIRECTIVE 2010/31/EU that requires increasing the number of nearly zero energy buildings. The existing commercial building stock needs to be included in order to achieve the 2020 EU environ ...
One of the long-standing issues in the field of corporate real estate corporate strategy. Extensive research into existing approaches brought valuable insights into steps, components and variables that are needed in the alignment process. Despite that, it is not clear if existing ...