A holistic optimization tool for bottom fixed offshore wind farm design and control

Offshore wind farms, critical for sustainable energy production, face the challenge of optimization among many parameters influencing key performance indicators in competitive ways. This research introduces the novel Integrative Maximized Aggregated Preference Wind Farm Optimizat ...
Facing circular transition challenges, building circularity should be evaluated in the early design phase to reduce the risks of circular and environmental performance problems found in later project phases. However, due to the current design workflow, such practice is hindered b ...
Building Information Models (BIM) should reflect all aspects and phases of the construction projects life cycle. However, in current contractor practices, a proliferation of different information systems has arisen, each of which in turn illuminates a different information model ...
Infrastructures are subjected to rapidly changing future developments. These future developments, in combination with the complex nature of infrastructure systems, involves assessing multiple variables and their underlying relations. It is hard for asset managers to incorporate t ...
This paper presents a novel approach to modelling and documenting design knowledge: to use parametric technology to explicitly store knowledge which exists in a group of people (such as a company), so that it can be reused over many projects and grow over time when more projects ...
Infrastructure asset managers are challenged by rapid changes around the world such as urbanisation and climate change. They have to deal with multiple complex and dynamic infrastructure systems that can influence each other and that can be influenced by various uncertain factors ...
BIM (building information modeling) can be the basis for carrying out various performance analyses. Sustainable infrastructure rating systems are suitable tools for assessing an infrastructure’s environmental performance. It is necessary to integrate them in the design process. T ...
This paper evaluates experiences with applying a linked data approach for coping with the many challenges for information management in asset management from the perspective of National Road Authorities (NRAs). As influential players, NRAs are often the initiators of innovation i ...
In construction projects, Building Information Modeling (BIM) influences on the common way of collaboration, including the roles of different participants. The goal of this research is to explore current practices and identify the critical effects of BIM on collaborative design a ...
In principle, Building Information Modelling (BIM) should provide a basis for infrastructure information management during the whole life-cycle. In practice however, the use of BIM is normally limited to the design and construction phases. It seems that the use of BIM information ...