A visual assessment tool for mine development
The development of an evaluation tool to compare the visual impact of opencast mining operations in the pre-feasibility phase
Surface mining operations can have a significant visual impact on the surrounding landscape and communities. There have been numerous cases of local populations pushing back against the development of mining operations near their communities. This study aims to determine whether
...
Open-pit mining blast patterns are designed to safely break rock mass at desired boundaries and to produce uniformly sized fragments that lead to the optimal performance of subsequent mining operations. An issue that is often overlooked, however, is the deviation of drillhole loc
...
To optimise mining in a safe, geotechnically controlled and economical most beneficial way in Mine 2 of the Stjernøy mine, a choice has been made to review the current mining method, sublevel open stoping, and a different mining method, vertical crater retreat. The Stjernøy mine
...
The aim of this master thesis is to improve a raw materials certification scheme by checking and validating the application matrix and the coherent hazards developed for the Certification of Raw materials (CERA) project. The scope of the original application matrix included expl
...
Current evacuation plans for underground mines are inefficient and outdated. Simulations have proven that smart evacuation can significantly increase the efficiency of escape times in case of an emergency. In a smart evacuation, miners are given real time instructions on a smart
...
Large quantities of mine tailings are stored in mine tailings storage facilities. These facilities are only costing money for mining companies. In addition, these tailings storage facilities are prone to failure. To prevent this from happening these facilities have to be reinforc
...
Repetitive construction projects allow for planning to be done systematically, but performance is hard to predict due to inherent uncertainties. The goal of this research is to evaluate planning choices in repetitive construction projects. In order to evaluate the planning of the
...
An investigation in the possibility to integrate fleet selection (through FPC) in the mine design process, allowing for the analysis of various potential haul road scenarios and from there being able to make a decision on an optimal fleet selection.
In the mining industry the initial capital expenditure budgeted in the feasibility study is being overrun structurally. These capital expenditure overruns have long been recognised, yet no method is available predicting the probability a mining project will experience an overrun.
...
Application of critical controls for fatality prevention in mining operations
Case study in an AngloGold Ashanti gold mine
Up until now, global mining companies have failed to create a fatality free environment for their employees, whether it be through increasingly difficult conditions or inadequate safety management approaches. Desiring to maintain the social license to operate, these companies are
...