Simulation of an underground cut and fill mine

A simulation approach using SimMine to determine the systems bottlenecks and the added value of additional miners in the production shift

The case study consist of a small underground mine with a small mining crew. The vehicle park is relatively large, and therefore it is necessary to establish the added value of additional miners or equipment for short-term production planning purposes, assuming that staff size cu ...
Blasting and drilling serves as an essential element for a mining operation to excel. Optimization of this operational aspect, requires consideration of various parameters that can be controllable or uncontrollable. To overcome the tediousness of analyzing each element selectivel ...