GM

G.A. Morales Espana

26 records found

In this paper, we aim to analyse the impact of hydrogen production decarbonisation and electrification scenarios on the infrastructure development, generation mix, CO2 emissions, and system costs of the European power system, considering the retrofit of the natural gas ...
The integration of Distributed Energy Resources (DERs) in distribution networks comes with challenges, like power quality concerns, but also opens up new opportunities, e.g., DERs can offer competitive energy prices for final users by leveraging time arbitrage. A suitable method ...
The increase of solar photovoltaic penetration poses several challenges for distribution network operation, mainly because such high penetration might cause reliability problems like protection malfunctioning, accelerated decay of voltage regulators and voltage violations. Existi ...
Day-ahead electricity markets are inefficient due to their coarse discretisation of time and their representation of electricity production and consumption in energy per time interval. This leads to excessive costs and infeasible schedules in the market clearing results. Some rea ...
The increasing penetration of uncertain generation such as wind and solar in power systems imposes new challenges to the unit commitment (UC) problem, one of the most critical tasks in power systems operations. The two most common approaches to address these challenges — stochast ...
This paper presents the design of an energy management system (EMS) capable of forecasting photovoltaic (PV) power production and optimizing power flows between PV system, grid, and battery electric vehicles (BEVs) at the workplace. The aim is to minimize charging cost while redu ...

Erratum to

Energy management system with pv power forecast to optimally charge evs at the workplace (IEEE Transactions on Industrial Informatics (2018) 14:1 (311-320) DOI: 10.1109/TII.2016.2634624)

In [1], the name of one co-author, Germán Morales-Espana, was rendered incorrectly as Germán Morales-Espana Mouli. The correct byline is shown above. We sincerely regret the error.@en
The emergence of distributed energy resources can lead to congestion in distribution grids. DC distribution grids are becoming more relevant as more sources and loads connected to the low voltage grid use dc. Bipolar dc distribution grids with asymmetric loading can experience pa ...
In power systems, demand and supply always have to be balanced. This is becoming more challenging due to the sustained penetration of renewable energy sources. Because of the increasing amount of electrical vehicles (EVs), and the high capacity and flexibility of their charging p ...

Are Optimal Day-Ahead Markets Able to Face RES Uncertainty?

Evaluating Perfect Stochastic Energy Planning Models

Approximations made in day-ahead markets can result in suboptimal or even infeasible schedules for generating units and inaccurate predictions of actual costs and wind curtailment. Here we compare different optimal models of day-ahead markets based on unit commitment (UC) formula ...
Approximations made in traditional day-ahead unit commitment model formulations can result in suboptimal or even infeasible schedules for slow-start units and inaccurate predictions of actual costs and wind curtailment. With increasing wind penetration, these errors will become e ...
The growing increase of renewable generation worldwide is posing new challenges for a secure, reliable and economic operation of power systems. In order to face the uncertain and intermittent production of renewable sources, operating reserves must be allocated efficiently and ac ...
This paper provides the convex hull description of the single thermal Unit
Commitment (UC) problem with the following basic operating constraints: (1) generation limits, (2) start-up and shut-down capabilities, and (3) minimum up and down times. The proposed constraints can b ...
In this paper, we propose a method to analyze the amount of operation reserves procured in a system based on two stages. The first stage is a detailed hourly unit commitment and the second stage is a simulation model with a shorter time period. The method is applied to the Spanis ...
In order to cope with fluctuations and uncertainty, power systems rely on contracted reserves. The day-ahead Unit Commitment (UC) is the short-term planning process which is commonly used to schedule these resources at minimum cost, while operating the system and units within sec ...
Private investors, flexibility, efficiency and environmental requirements from deregulated markets have led the existence and building of a significant number of combined-cycle gas turbines (CCGTs) in many power systems. These plants represent a complex optimization problem for t ...
This paper provides the convex hull description for the basic operation of slow- and quick-start units in power-based unit commitment (UC) problems. The basic operating constraints that are modeled for both types of units are (1) generation limits and (2) minimum up and down time ...
This paper proposes a power-based network-constrained unit commitment (UC) model as an alternative to the traditional deterministic UCs to deal with wind generation uncertainty. The formulation draws a clear distinction between power-capacity and ramp-capability reserves to deal ...
In recent years, high penetration of variable generating sources, such as wind power, has challenged independent system operators (ISO) in keeping a cheap and reliable power system operation. Any deviation between expected and real wind production must be absorbed by the power sy ...