AR

A Ramos

7 records found

This paper provides the convex hull description of the single thermal Unit
Commitment (UC) problem with the following basic operating constraints: (1) generation limits, (2) start-up and shut-down capabilities, and (3) minimum up and down times. The proposed constraints can b ...
The allocation of risk among the cooperating parties in a shared project is an important decision. This is especially true in the case of large infrastructure investments. Existing risk allocation methods are either simplistic or do not consider the effect of the agents' pre-exis ...