Self-organized industrial symbiosis (IS) starts with one actor's decision to invest in a waste recovery plant and the other actors' decision to buy the recovered flow. Technical and institutional conditions of the cluster influence actors' decisions. This paper explores the emerg ...
The Netherlands is known for its high penetration of natural gas use in households and industry, but the threat of climate change and earthquakes in the province of Groningen, caused by natural gas production, stimulate the search for alternatives, such as hydrogen gas. Various w ...
Systems engineering is the dominant approach for designing flexibility in infrastructure systems. However, the approach merely focuses on physical elements of the system as 'objects of design', whereas hardly any attention is given to the institutional structures (e.g. contracts) ...
Renewable energy sources are currently presented as an economically viable and environmentally safe option in the near future. A major constraint to the incorporation of wind and solar generation at large scale is the increase of variability in the power system. To assure the per ...
This paper presents a systematic design analysis method based on the flexible design approach and the concept of real options to support decision-makers during conceptual design of infrastructure public–private partnership projects under uncertainty. It employs probabilistic and ...
Energy and industrial networks such as pipeline-based carbon capture and storage infrastructures and (bio)gas infrastructures are designed and developed in the presence of major uncertainties. Conventional design methods are based on deterministic forecasts of most likely scenari ...
The allocation of risk among the cooperating parties in a shared project is an important decision. This is especially true in the case of large infrastructure investments. Existing risk allocation methods are either simplistic or do not consider the effect of the agents' pre-exis ...
Several carbon capture and storage (CCS) projects around the world were cancelled, delayed or are on hold due to different types of barriers, such as: economic, legal, social and technical. Previous works treat these barriers as independent factors, ignoring potential interaction ...
This research project gives an integrated technical and institutional design to outline how wind energy peaks can be converted into value-added products by making optimal use of the synergies that may exist in the Rotterdam Harbor area. As the number of hours that power prices ar ...