Day-ahead electricity markets are inefficient due to their coarse discretisation of time and their representation of electricity production and consumption in energy per time interval. This leads to excessive costs and infeasible schedules in the market clearing results. Some rea ...
Large controllable loads, such as electric vehicles, are increasingly penetrating electricity distribution feeders. To avoid local congestion, their consumption behaviour must be steered, for which a real-time price propagated down from the transmission system does not suffice, a ...
In order to cope with fluctuations and uncertainty, power systems rely on contracted reserves. The day-ahead Unit Commitment (UC) is the short-term planning process which is commonly used to schedule these resources at minimum cost, while operating the system and units within sec ...