Development of a proposal work schedule forecasting method

For engineering work packages in custom trailing suction hopper shipbuilding projects at Royal IHC

An issue that arises during the execution of shipbuilding engineering projects at Royal IHC is an imbalance between the sum of all necessary engineering work, and all engineers that are employed who are available to execute the work. This research aims to develop a new method to ...
This project analyses the feasibility of the integration of an automation system for custom-made composite part production at the superyacht equipment manufacturer Rondal BV. An analysis of the current prepreg production is performed to understand the automation opportunities and ...
There is a never-ending quest to search for better ways of planning and controlling projects. Currently the majority of all projects are planned with the critical path method and controlled using earned value management. This way of planning and controlling projects has been used ...

Decommissioning platforms on the North Sea:

Guidelines on heavy lift vessel selection

This thesis contains the model development of a simulation model, to aid the selection of a heavy lift vessel for a North Sea decommissioning project. The model considers fixed steel platforms with maximum topside weight of 1.400 [tons].

A model based approach to the automatic generation of block division plans

On the effective usefulness in ship production optimization algorithm

European shipyards are building increasing amounts of complex ships such as off-shore, dredging or naval ships that are engineered-to-order. The block division is made when only preliminary hull structural design, functional compartments and the location of major equipment are kn ...

Case Based Reasoning

As a Cost Estimation Method for the Ship Building Industry

Accurate cost estimations are important for ship production companies such as Royal IHC. The research discussed is based on a feasibility study for a CBR cost estimation method. The current cost estimation method at IHC is a top-down price-to-win analogy cost estimation. This met ...

Reducing pipe penetration costs in shipbuilding

A new engineering & production approach to eliminate manual cutting by use of large predetermined openings

Western shipyards have to distinguish themselves by complex ships with short delivery times. This entails that in most cases the production already starts while the engineering has not even been finished. If the pipes and cables are not routed when the steel plate are cut by the ...