Decommissioning platforms on the North Sea:

Guidelines on heavy lift vessel selection

More Info
expand_more

Abstract

This thesis contains the model development of a simulation model, to aid the selection of a heavy lift vessel for a North Sea decommissioning project. The model considers fixed steel platforms with maximum topside weight of 1.400 [tons].

Files

Report_final_Diedert_Boltje.pd... (pdf)
(pdf | 7.46 Mb)
- Embargo expired in 21-01-2022
Unknown license