Diagnostics of HV power cables are playing an important role in the meaning of two aspects: 1) on-site diagnostic of new installation, where a commissioning test has to prove the absence of any defects in the cable insulation and accessories, after transportation and installation
...
Diagnostics of HV power cables are playing an important role in the meaning of two aspects: 1) on-site diagnostic of new installation, where a commissioning test has to prove the absence of any defects in the cable insulation and accessories, after transportation and installation. 2) On-site diagnostic of a serviced aged power cable where the condition after a period in service or information about workmanship of repairs has to be known. As it is known some installation defects can result in breakdown even after a successful after-laying test. Obtaining more diagnostic parameters like; Withstand Voltage, Partial Discharges (PD) and Dielectric Loss (tan ¿), providing a indication of insulation condition and accessory performance. In this paper several examples of on-site tests on new and serviced aged XLPE HV power cables will be discussed. Examples of: after-repair, after-laying, and condition assessment tests will be presented as performed with Damped AC diagnostics.@en