Analyzing rain erosion using a Pulsating Jet Erosion Tester (PJET)

Effect of droplet impact frequencies and dry intervals on incubation times

Accelerated laboratory testing is essential to understand the rain erosion behavior of coated samples applied to the leading edge surface of a wind turbine blade. This study investigates the impact of droplet impact frequencies and dry intervals on the incubation time for damage ...
A fiber-reinforced composite wind turbine blade (WTB) is exposed to numerous impact threats during its service life causing damages that can be detrimental to its structural integrity. Currently, impact loads are not considered during blade design, so high safety factors are intr ...
Rain-induced leading-edge erosion of wind turbine blades is associated with high repair and maintenance costs. For efficient operation and maintenance, erosion models are required that provide estimates of blade coating lifetime at a real scale. In this study, a statistical rainf ...
Leading edge erosion (LEE) repairs of wind turbine blades (WTBs) involve infield application of leading edge protection (LEP) solutions. The industry is currently aiming to use factory based LEP coatings that can applied to the WTBs before they are shipped out for installation. H ...
The rain-induced fatigue damage in the wind turbine blade coating has attracted increasing attention owing to significant repair and maintenance costs. The present paper develops an improved computational framework for analyzing the wind turbine blade coating fatigue induced by r ...
Being one of the most commonly used offshore operations, offshore lifting operations become increasingly challenging due to the gradually growing size and weight of payloads. The research on automatic control in lifting operations, e.g., anti-swing control and heave compensation, ...
The application of floating wind turbines is limited by the high cost that increases with the water depth. Offshore installation and maintenance continue to consume a high percentage of the project budget. To improve the installation efficiency of the floating offshore wind turbi ...
Floating structures oscillate in waves, where these wave-induced motions may be critical for various marine operations. An important consideration is thereby given to the sea states at the planning and operating stages for an offshore project. The most important information extra ...
The presence of rain-induced leading edge erosion of wind turbine blades (WTBs) necessitates the development of erosion models. One of the essential parameters for erosion modeling is the relative impact velocity between rain droplets and the rotating blade. Based on this paramet ...
The leading edges of wind turbine blades are adhesively bonded composite sections that are susceptible to impact loads during offshore installation. The impact loads can cause localized damages at the leading edges that necessitate damage tolerance assessment. However, owing to t ...
Operations and maintenance of offshore wind turbines (OWTs) play an important role in the development of offshore wind farms. Compared with operations, maintenance is a critical element in the levelized cost of energy, given the practical constraints imposed by offshore operation ...
Rain-induced leading-edge erosion (LEE) of wind turbine blades (WTBs) is associated with high repair and maintenance costs. The effects of LEE can be triggered in less than 1 to 2 years for some wind turbine sites, whereas it may take several years for others. In addition, the gr ...

Leading edge erosion of wind turbine blades

Effects of blade surface curvature on rain droplet impingement kinematics

The issue of leading edge erosion (LEE) of wind turbine blades (WTBs) is a complex problem that reduces the aerodynamic efficiency of blades, and affects the overall cost of energy. Several research efforts are being made at the moment to counter erosion of WTBs such as-testing o ...
Single-blade installation is a conventional method for installing blades on monopile-type offshore wind turbines. A jack-up crane vessel is commonly used, and individual blades are lifted to the tower top height and mated with the hub. The relative motions between the hub and bla ...

Leading edge erosion of wind turbine blades

Effects of environmental parameters on impact velocities and erosion damage rate

Leading edge erosion (LEE) of a wind turbine blade (WTB) is a complex phenomenon that contributes to high operation and maintenance costs. The impact between rain droplets and rotating blades exerts cyclic fatigue stresses on the leading edge - causing progressive material loss a ...
The leading edge of a fiber composite wind turbine blade (WTB) is prone to erosion damages due to repeated rain droplet impact during its service life. Such damages are critical to the blade's aerodynamic as well as structural performance, ultimately resulting in substantial repa ...

Effects of Wind-Wave Misalignment on a Wind Turbine Blade Mating Process

Impact Velocities, Blade Root Damages and Structural SafetyAssessment

Most wind turbine blades are assembled piece-by-piece onto the hub of a monopile-type offshore wind turbine using jack-up crane vessels. Despite the stable foundation of the lifting cranes, the mating process exhibits substantial relative responses amidst blade root and hub. Thes ...