BT

Botao Tu

2 records found

Using solid waste to replace limestone filler in asphalt concrete can not only reduce the cost of road construction, but also improve the utilization rate of solid waste. In this study, PHC pile waste concrete (PPWC) was innovatively used to replace limestone filler in asphalt mi ...
As a kind of solid waste, using Prestressed High-Strength Concrete Pile Waste Concrete (PPWC) as the replacement for limestone filler in asphalt concrete can not only reduce the accumulation of PPWC and increase its utilization but also avoid the increased road construction costs ...