KF

K.A.T.J. Franken

2 records found

The main goal of this project is to determine the optimal location for an OTEC installation with a minimum lifespan of 30 years off the coast of Barranquilla and to make an anchor mooring design for the floater on which this installation is located. Bluerise has identified an are ...

A probabilistic approach to pipeline start-up structure installations

Structural reliability assessment utilizing the resistance parameters

Subsea pipeline are extensively used for the transport of hydrocarbons from offshore wells, to platforms, pump stations and to onshore facilities. Because the installation of pipelines is time consuming it is responsible for a significant amount of the total costs of a project. T ...