LZ

L. Zhou

1 records found

It is desirable to predict construction cost with a high level of accuracy in the early phase to compare the budgetary with feasibility determinations. Additionally, it is required to be as quick as possible. However, the accuracy of the cost estimation depends on the design deta ...