Av

A.Q.C. van der Horst

3 records found

This research aims to identify the underlying mechanisms of the cost of rework related to constructability in Dutch marine infrastructure projects. Despite extensive previous research on the cost of rework, and constructability, the underlying mechanisms within executed projects ...

Lange overspanningen in geprefabriceerd beton

Een onderzoek naar brugoplossingen om langere overspanningen, tot 100 meter, mogelijk te maken in geprefabriceerd beton

The Netherlands is a densely populated country with a congested road and railway network. Therefore more and more highways are widened and expanded. These wider highways create a demand for bridges which are suited for longer spans. These bridge solutions should constructed with ...

The overturning caisson

Construction method reconsidered

The construction method of an overturning caisson is reconsidered. This particular self-floating caisson was applied for several caisson quay wall projects over a century ago. After the year 1914, the design was abandoned. After this time, rectangular caissons became more econom ...