In the field of urban development few challenges are as tough as the housing problem. The cause for this is the rapid expansion of urban populations combined with slow construction processes. The Open Design Systems (Odesys) methodology is a preference-based design methodology fo ...
Gaining insights into anticipated future expenses is essential for both the planning and construction phases of a project. A significant factor in future costs, particularly over extended periods, is the variability of material and labor prices. the change in costs over time, kno ...
The construction and infrastructure industry has witnessed an increase in the need for an optimized mitigation strategy to combat schedule and cost overruns amid the rise in market competitiveness and more strict timelines and budgets. Moreover, projects nowadays are more complex ...

Extension of the Mitigation Controller for construction costing on the run

Minimizing cost overruns for construction projects

Construction projects are notorious for going over budget. It is important for a project manager to have as much grip on the financial situation of the project as possible. In order to deal with the uncertainty that is prevalent in a construction project, a project manager should ...