Mv

M.A.J.P. van Dam

1 records found

New breakwater of Genoa

Application of a vine-copula model in probabilistic design

The authorities of the Port of Genoa have requested the construction of a new vertical breakwater for the Sampierdarena canal, as well as the subsequent demolition of part of the existing breakwater. The reason for this project is the need to expand the size of the canal, to allo ...