In late 2004 PLN P3B decided to apply a new strategy of maintenance, condition-based maintenance, to her high voltage assets. Before implementation, several preparation steps consisting of several aspects should be completed. In PLN case, besides lack or incomplete data, the aspe ...
PLN has put as many as 115 gas-insulated substations into operation since 1980' s. In general the installed GIS work properly ever since it was energized. However, few sustain problems occurs at some substations. Several precautions have been done to solve the problems which ende ...