MB

Marijn Brugman

1 records found

During the boring of a tunnel in soft soils with a slurry TBM, support pressure is used to achieve equilibrium at the face of the TBM. When this equilibrium is not reached, when the face support pressure is too low or too high, settlements will occur. In this research settlement ...