ZW

Zhichao Wu

1 records found

Three identical pilot-scale flat-sheet membrane-coupled aerobic digesters for simultaneous sludge thickening and reduction (MSTR) were performed in parallel under a hydraulic retention time (HRT) of 14.6 h for 15 days. In the first 8 days, the stepwise destruction of waste activa ...