WL
W.L. Leendertse
7 records found
1
Due to the extensive duration and the dynamic environment of construction projects, changes in contract conditions are inevitable during its implementation. Therefore, it is important that changes are actively managed during the project life cycle. However, contracts do not alway
...
Flexibility in PPP contracts
Dealing with potential change in the pre-contract phase of a construction project
Public Private Partnerships (PPPs) cover a range of possible relationships between public and private parties. PPP contracts are typically used in contexts of great uncertainty, such as large construction and infrastructure projects that are realized over a longer period of time.
...
The construction industry is going through hard times in many countries. This is certainly true in the Netherlands as all big Dutch contractors face disappointing results. The market policies of major (public) clients are held accountable by politics and the market for this situa
...
Pre-contract assumptions in practice
A qualitative study on the flexibility to changes in DBFM contracts - Blankenburgverbinding project case study
PPPs (Public Private Partnerships) are a range of possible relationships between public and private parties. They are realized mostly in contexts of great uncertainty. A challenge in PPPs such as DBFM (O) (Design, Build, Finance, Maintain, Operate) contracts or projects is how to
...