SM

S.A. Miedema

156 records found

Wave-to-Wire models play an important role in the development of wave energy converters. They could provide insight into the complete operating process of wave energy converters, from the power absorption stage to the power conversion stage. In order to cover a set of relevant no ...
An adjustable draft point absorber was recently proposed as a novel approach to improve power absorption with constrained power take-off (PTO) capacities. The key feature of the novel wave energy converter (WEC) concept is to adjust the buoy draft by regulating the ballast water ...
The power take-off (PTO) system is a main component in wave energy converters (WECs), and it accounts for a notable proportion in the total cost. Sizing the PTO capacity has been proven to be significant to the cost-effectiveness of WECs. In the numerical modeling, the PTO size i ...
A spectral domain model is established to analyze the performance of a recently proposed wave energy concept, namely the adjustable draft point absorber. The non-linear hydrostatic force is incorporated in the spectral domain model. To improve the accuracy of the proposed model, ...
A crucial part of wave energy converters (WECs) is the power take-off (PTO) mechanism, and PTO sizing has been shown to have a considerable impact on the levelized cost of energy (LCOE). However, as a dominating type of PTO system in WECs, previous research pertinent to PTO sizin ...
The Power Take-Off (PTO) rating of Wave Energy Converters (WECs) is generally much higher than the average extracted power. Scientific literature has indicated that downsizing the PTO capacity to a suitable level is beneficial for improving the techno-economic competitiveness. In ...
PTO (Power Take-off) systems in WECs (Wave Energy Converters) are generally overrated with regard to the average extracted power, which is not economically favourable. However, there is no explicit and agreed approach on how to limit the absorbed power without damaging WECs. In t ...
A jet pump is used to transport a variety of working media and is especially suitable for dredged soil transporting. In this study, a three-dimensional numerical study of a jet pump that is used for slurry delivery was carried out. The characteristics of the internal flow field o ...
Downsizing the Power Take-off (PTO) rating has been proven to be beneficial for decreasing the Levelized Cost of Energy (LCOE) of wave energy converters (WECs). However, the linear permanent magnet (PM) generator has not yet been modelled and optimized in detail in previous feasi ...
Currently, the techno-economic performance of Wave Energy Converters (WECs) is not competitive with other renewable technologies. Size optimization could make a difference. However, the impact of sizing on the techno-economic performance of WECs still remains unclear, especially ...
In this paper, a fair evaluation method of WECs (Wave Energy Converters) is established based on frequency domain simulation. In this fair evaluation, size optimization and downsizing of PTO (Power Take-Off) capacity are included to minimize the Cost of Energy for the concerned w ...
Production Engineers are asked to provide estimated productions and operational guidance for dredging plant that works in a rapidly changing and dynamic environment. These engineers use models to apply scientific principles and engineering practices. The models must have three pr ...
In the past years a new slurry transport model has been developed, based on an extensive literature survey, 5 different flow regimes and a constant spatial volumetric concentration (in time and space). This model is named the Delft Head Loss & Limit Deposit Velocity Framework ...
Numerous offshore wind farms have been installed recently in the southern part of the North Sea. Their infield and export cables are buried for protection against dropped or dragged objects. In sandy soils, burial is carried out by remotely operated tracked vehicles. Two swords w ...
Spillage is a problem for many dredging projects that make use of a Cutter Suction Dredge (CSD). In addition to higher energy consumption for delivering the targeted depth, spillage can lead to a variety of environmental issues. Equally important is the operator's uncertainty as ...

Slurry Transport

Fundamentals, A Historical Overview & The Delft Head Loss & Limit Deposit Velocity Framework

In dredging, trenching, (deep sea) mining, drilling, tunnel boring and many other applications, sand, clay or rock has to be excavated.The book covers horizontal transport of settling slurries (Newtonian slurries). Non-settling (non-Newtonian) slurries are not covered.@en
Slurry transport is a very important means of transporting solids through a pipeline. To improve the efficiency of slurry transport, especially in coarse particle transport, which is subject to problems such as strong resi ...
One of the main types of equipment is the cutter suction dredge (CSD). The theoretical soil production Qc equals the cross section of the cutter head in the bank cutting, perpendicular to the swing velocity vs times the swing velocity vs. If the theoretical soil production is 100 ...
Currently, a fundamental relation between cohesion and adhesion in cohesive soils has not been established. Yet, it is of great importance to get a better understanding of the relationship between cohesive and adhesive forces, because the large surfaces on dredging tools can gene ...
In dredging soil is excavated with dredging equipment. One of the main types of equipment is the cutter suction dredge (CSD). The CSD consists of a floating pontoon, with in the back a spud pole penetrating the soil. In the front there is a ladder, which can rotate around a horiz ...