MS

M.A. Schoemaker

1 records found

Contributed

The centre piece of Galveston Bay’s 34 billion dollar flood risk reduction plan is a 3.6 km long storm surge barrier built across the Bay’s main tidal inlet. The barrier, which consists of a series of vertical lift gates and two large floating sector gates, will close when a hurr ...