Rv
R. Pepijn van Denderen
11 records found
1
Floods can cause punctuated changes to river channel morphology over short time scales. This work investigates whether spatial variation in river floodplain width drives enhanced morphodynamic change during floods. We examine the relationship between longitudinal variation in flo
...
Local river interventions, such as channel narrowing or side channels, are often necessary to maintain safety, ecology, or navigation. Such interventions have different effects on the river's bed morphology during periods of high- and low-discharge events. Mapping the bed-level v
...
River peak flows that exceed the conveyance of the main channel can substantially alter channel bed morphology over event timescales. Consecutive peak flows over short periods may also result in incomplete river bed recovery between events, affecting future flood hazards; for exa
...
Disentangling changes in the river bed profile
The morphological impact of river interventions in a managed river
The river bed level in low-land rivers like the Rhine branches in The Netherlands changes continuously on various spatial and temporal scales. Large-scale degradation occurs in many rivers due to river-wide engineering interventions, such as channelization, in the last decades an
...
Human interventions can result in changes in the equilibrium profile of rivers. It is difficult to identify the bed level changes that result from river interventions due to the various causes of bed level changes. Using wavelet filtering, we are able to isolate the effect of riv
...
Side channels are commonly constructed to reduce the flood risk or to increase the ecological value of a river. Such artificial side channels generally aggrade. We categorize the development of side channels based on the sediment that is deposited in these channels. Based on this
...
Side channel construction is a common intervention to increase both flood safety and the ecological value of the river. Three side channels of Gameren in the river Waal (The Netherlands) show amounts of large aggradation. We use bed level measurements and grain size samples to ch
...
Side channel construction is a common intervention applied to increase a river's conveyance capacity and to increase its ecological value. Past modelling efforts suggest two mechanisms affecting the morphodynamic change of a side channel: (1) a difference in channel slope between
...