Shore Power at Royal Roos
A flexible approach to Shore to Ship power infrastructure
More Info
expand_more
expand_more
Abstract
For the delivery of Shore to Ship power, the 'status quo' of shore power delivered just from the grid results in the overcapacity of power installation, these resources need to be more optimally utilized.
This research investigates what configuration of electrical components to deliver shore power to vessels is the most cost-effective at the quay-side of Royal Roos.
This thesis ends with the answers to the research questions that guided the research, and thereby help explain under which conditions an implementation for shore power supply is more cost-effective than another