IM

I.C.W.M. Marijnissen

2 records found

This paper looks at the different parts of the Critical Path and Resource Utilization (CPRU) heuristic for use in the Resource Constraint Project Scheduling Problem, with variable resources (RCPSP-t programming problem). RCPSP-t has many real-world instances such as in hospitals ...

A heuristic-guided constraint programming approach to PRCPSP-ST

Using priority-rules to guide constraint solvers

This paper introduces a new approach to the Preemptive Resource Constrained Project Scheduling Problem with setup times. The method makes use of a Constraint Optimization Problem solver, which has been modified to use priority-rule-based heuristics in its variable and value selec ...