KM

K.S. Mountakis

3 records found

Scheduling under uncertainty

Attaining flexibility, robustness and stability

The research presented in this thesis is part of the Rolling Stock Life Cycle Logistics applied research and development program, conducted by NedTrain. As a company, NedTrain belongs to Nederlandse Spoorwegen (NS; the principal railway company in the Netherlands) and provides ma ...
This paper concerns networks of precedence constraints between tasks with random durations, known as stochastic task networks, often used to model uncertainty in real-world applications. In some applications, we must associate tasks with reliable start-times from which realized s ...
We discuss two flexibility metrics for Simple Temporal Networks (STNs): the so-called naive flexibility metric based on the difference between earliest and latest starting times of temporal variables, and a recently proposed concurrent flexibility metric. We establish an interest ...