EB

Erik F.R. Bollaert

2 records found

Chancy-Pougny is a run-of-river dam on the Swiss-French border constructed in the early 1920s. Since its commissioning, the operation of the four spillway gates has been responsible for a progressive erosion of the stilling basin. The future scour potential of the unlined stillin ...
Chancy-Pougny is a run-of-river dam on the Swiss–French border constructed in the early 1920s. Since its inauguration, the operation of the four spillway gates was responsible for a progressive erosion of the stilling basin. Thus, a hybrid modelling was performed to study the sco ...