PJ

P.B. Janssen

2 records found

Towards a nature-based solution for the Brouwersdam beach in the Netherlands

Following the Building with Nature approach to counteract long-term erosion of a recreational beach as a consequence of large-scale morphological changes in a closed-off outer delta

Since the Brouwersdam was built as part of the Delta plan, the Grevelingen outer delta undergoes large-scale morphological changes. These changes led to the formation of a shoal adjacent to the dam, which is referred to as the Brouwersdam beach. The beach has been eroding and shi ...
The goal of this study is to examine the feasibility of this solution, from a water quality and hydraulic point of view. Firstly, the current state of the three water bodies was investigated and a stakeholder analysis was conducted to look into the social and political context. S ...