Increase in wind- and solar parks complicate grid stability due to their deterministic behaviour. ENTSO-E established requirements for generators for grid connection in Europe. A requirement is to have active- and reactive power control that implements a power setpoint given by t
...
Power flow control in a substation of a wind- and solar farm
Design of an Optimisation Unit Considering a System's Physical Boundaries and Technical Constraints
The goal of this graduation project was to design a state-of-the-art central farm controller. The designed central farm controller distinguishes itself from prevailing controllers by including a subsystem (the optimisation unit) that contributes to an improvement in power transmi
...