AM

Achila Manzini

2 records found

Deliverable D4.2

Guidelines for a Safe and Optimised Moving-Block Traffic Management System Architecture

This deliverable contains the output of the activities performed for Task 4.3 “Guidelines on integrated traffic management architectures for safe and optimised moving-block operations” of the EC Shift2Rail PERFORMINGRAIL project. A real-time model for Moving Block traffic conflic ...

Deliverable D4.1

Real-Time Traffic Rescheduling Algorithms and Perturbation Management and Hazard Prevention in Moving-Block Operations

This deliverable has the objective to define a mathematical model for an optimised real-time management of railway traffic under Moving Block (MB). The formulated real-time traffic management model contains: i) a core module for the detection and the sub-optimal resolution of tra ...